Construction: Steps to follow
PROPERTY GUIDE
Return to the summary



Here are the main administrative and technical steps underlying the construction of a property.



1 - administrative STEPS :

    

·        Financing a project

·        Obtaining and displaying building permission

·        Acquiring a plot of land

·        Taking out insurance for the work



 

2) PREPARING THE BUILDER:


Période prévue : deux à quatre mois minimum avant le début du chantier, à compter de la date d’obtention du permis de construire (délai légal de recours des tiers et de retrait administratif)

     • Désignation du responsable du suivi des travaux
     • Confirmation de vos choix
     • Formalités d’ouverture de chantier
     • Branchements provisoires, accès au terrain, bornage, débroussaillage, dessouchage
     • Formalités pour branchements définitifs


3 - Executing the work :


Time scales: forming your work schedule

 

  • The main phases of construction:

-          The work of the builder (setting out, excavations) from the moment payment is requested you have the chance to check the progress and conformity of the work

-          Completing the foundations (foundations)

-          Completing the walls (block work)

-          Topping out (roof), taking out multi risk housing insurance (advice)

-          Fences + outside space (fencing in, partitions)

-          Completing the fit out work (certain changes are possible during the course of work), plumbing, carpentry and the heating according to the specifications of both parties. (fixtures and fittings, interior adjustments)

 

  • Handing over of the work and the keys at a meeting fixed at the end of the project.
  • Final connections, setting up the utilities.



The details shown are for guidance only and do not constitute part of any contract (E&OE).